Configuring Enabler for UPS monitoringVersion 2.50 introduced the UPS monitoring capability. To utilise this capability requires the use of the Power Chute software (must be version 5.2) from APC and a UPS which is supported by this. In the \enabler folder are the following batch files. These batch files need to be configured in the Power Chute configuration so that they are executed when the relevant events occur. Some batch files must be configured for multiple events.
If the UPS of the clients need to be monitored as well then the Power Chute software will need to be installed and configured on the client in the same manner. The contents of the batch files will also need to be edited. The last parameter to the EnbKick executable will need to changed to the terminal ID of the client in question. Related Items ©1997 - 2003 Integration Technologies Limited Last revised Wednesday, 04-Nov-2009 18:42:08 EST |